A barge operator requested the degassing of a 2.100 m³ inland barge that had previously transported Propylene. The operation was required to enable safe loading of an alternative cargo.
During the loading of gasoline into a seagoing vessel at a refinery in Antwerp, approximately 317.832 ft³ of gasoline vapors were displaced from the vessel’s cargo tanks.
A client required a temporary vapor recovery solution for an ethanol storage tank, designed to capture tank-breathing emissions and prevent atmospheric release during operations.
A 3.000 m³ tanker barge previously loaded with naphtha required degassing and purging before inspection and maintenance, targeting a vapor level below 10% LEL.